The laying of high pressure pipes in the community of Terenten
Project begin: 2008
Contract awarder: E-Werk Winnbeach Konsortial GmbH
Location of the works: Terenten – (BZ) – Italy
Project completion: 2008
Project:
The laying of high pressure pipes for the Hydro power station Terenten - Vintl.
The high pressure piping is 3.1 km long and has a diameter of 800 mm.
References
- Civil engineering
- The laying of high pressure pipes – Freienfeld village
- The laying of high pressure pipes – Gsies village
- The laying of high pressure pipes – Terenten village
- District heating pipework - Ahrntal
- District heating pipework – Brixen
- District heating pipework – Vahrn
- District heating pipework - Kaiserau
- Technical Centre for Driving Safety “Safety Park”
- Hydroelectric plant - Welsberg
- Water reservoirs – ski resort Kronplatz
- Sewerage mains – Reischach
- Sewerage works – Welsberg village
- Sewerage works – Graun / Kurtatsch village
- Demolition / earth moving works – Athesia Buch building Bruneck
- Earth moving works – Acquarena Brixen
- Commercial Park Förche 3 Natz / Schabs village
- Landfill site construction
- Road Construction
- Sport and recreational facilities
- Structural engineering
- Electro cables
- Construction rubble – recycling